Wednesday, April 19, 2023

1326 Brake Rigging Work

 After operating last week, 1326 was brought back into the shop to continue the work on the brake rigging. 

As a part of the work, Gio removed one of the brake rigging arms that attaches the brake shoes on one of the trucks to the piston arm to be repainted

sanded and repainted brake rigging arm

After the reinstallation, new bolts and cotter pins were installed to replace the old ones.

Brake rigging bolted to the arm of the Brake Piston

Other end of the rigging bolted to the brake shoe mechanism

As the final part of putting the brake rigging back together, the slack adjuster needed to be adjusted to keep the appropriate amount of tension on the system. 

Gio working on reassembling the Slack Adjuster




No comments:

Post a Comment